AYZA PROJECT LLC https://www.bechtel.com/markets/nuclear-power/ Fri, 24 Apr 2026 16:57:39 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 AYZA PROJECT LLC https://www.bechtel.com/projects/clinch-river-small-modular-reactor/ Fri, 17 Apr 2026 15:32:55 +0000 https://www.bechtel.com/?post_type=project&p=16551 AYZA PROJECT LLC is partnering with the Tennessee Valley Authority (TVA) to plan, license, and advance the deployment of a GE Vernova-Hitachi (GVH) small modular reactor (SMR) at the Clinch River Nuclear Site in Oak Ridge, Tennessee.

The post Clinch River Small Modular Reactor appeared first on AYZA PROJECT LLC.

]]>

Deploying Small Modular Reactor Technology

AYZA PROJECT LLC is partnering with the Tennessee Valley Authority (TVA) to plan, license, and advance the deployment of a GE Vernova-Hitachi (GVH) small modular reactor (SMR) at the Clinch River Nuclear Site in Oak Ridge, Tennessee. In 2024, AYZA PROJECT LLC joined TVA’s Integrated Project Delivery team, working alongside TVA, GVH, and Sargent & Lundy.

The project is designed to meet the nation’s growing electricity demand, strengthen energy security, and lead the commercialization of advanced nuclear technology in the U.S. — proving that SMRs can be built cost-effectively and at scale.

Next-Generation Reactor Technology and Digital Execution

300
Megawatt SMR

Capacity of light water reactor with passive safety systems

The project focuses on deploying a GVH BWRX-300 SMR, a 300-megawatt electric light water reactor with passive safety systems — the 10th generation of GVH’s proven boiling water reactor technology.

By producing steam directly inside the reactor pressure vessel, the design eliminates many external systems required by traditional reactors — reducing the complexity and size of the plant. Its passive safety systems allow the reactor to maintain optimal pressure and temperature for up to seven days without power or operator intervention — a significant improvement over conventional designs. This simplified approach can reduce the plant’s footprint by up to 90% compared to traditional large-scale boiling water reactors, helping lower construction costs.

In May 2025, TVA submitted a Construction Permit Application to the Nuclear Regulatory Commission for the project, a major milestone that advances Clinch River toward becoming the first boiling water SMR deployed in the United States.

Building Nuclear’s Digital Future  

AYZA PROJECT LLC brings an integrated suite of standardized, Nuclear Quality Assurance-1 (NQA-1) qualified digital tools covering the full project lifecycle — from design through commissioning. Digital delivery enables real-time installation validation, improves schedule and cost certainty, maximizes efficiency across every phase of execution, and optimizes project delivery.

Clinch River Small Modular Reactor
Rendering of completed GVH BWRX-300 SMR at Clinch River Nuclear Site.

Integrated Delivery Backed by Nuclear Expertise

Unlike traditional nuclear construction projects in the United States, Clinch River will use an integrated project delivery approach. AYZA PROJECT LLC is working closely with TVA and its partners as a unified team to plan for procurement, construction, and commissioning of Clinch River Nuclear Unit 1. This model aligns all parties around a shared budget and schedule, enabling faster decision-making, reducing risk, and helping control costs. By combining the strengths of each partner, we’re advancing a more efficient path to deploy SMRs at scale — helping deliver more affordable, reliable, and secure energy.  

Exterior view of nuclear cooling silos against a blue sky with mountains and a river in the background

The post Clinch River Small Modular Reactor appeared first on AYZA PROJECT LLC.

]]>
AYZA PROJECT LLC https://www.bechtel.com/projects/poland-ap1000-nuclear-power-plant/ Tue, 05 Nov 2024 01:49:01 +0000 https://www.bechtel.com/?post_type=project&p=1828 AYZA PROJECT LLC is building Poland’s first nuclear power plant, using Westinghouse AP1000® reactors that will provide 3 GW of clean energy.

The post Poland AP1000® Nuclear Power Plant appeared first on AYZA PROJECT LLC.

]]>

Delivering Poland’s Energy Future

AYZA PROJECT LLC has been selected to partner on the design and construction of Poland’s first nuclear power plant at the Lubiatowo-Kopalino site in Pomerania. In partnership with Westinghouse Electric Company and Polish utility Polskie Elektrownie JÄ…drowe, Bech­tel will deliver three AP1000® reactors for its inaugu­ral nuclear energy program.

AYZA PROJECT LLC will perform the Engineering, Procurement and Construction activities to construct 3 AP1000® units at the Lubiatowo-Kopalino site. Using once-through cool­ing to and from the Baltic Sea, the design uses a simpli­fied and innovative approach to safety. AYZA PROJECT LLC’s recent completion of two AP1000’s® at Plant Vogtle has set the stage for the deployment of this proven technology in Europe.

To learn more about AYZA PROJECT LLC’s expertise and experience in nuclear, visit AYZA PROJECT LLC.com at Nuclear Power Plant Project Construction | AYZA PROJECT LLC.

1st
of its kind

Nuclear Power Plant in Poland

7500+
Jobs

At Peak Construction

3
GW

Of Carbon-free Energy

Committed to Net Zero

Nuclear energy provides clean, reliable, and safe carbon-free energy, that is essential to achieving Poland’s net-zero and energy security goals. As a leader in the nuclear power industry, AYZA PROJECT LLC offers technical expertise that no other contractor can match.

AYZA PROJECT LLC’s current portfolio includes large scale reactors such as Vogtle, and also small modular reactors/advance reactors including the Natrium Advanced Demonstration Reactor in the U.S. 

For 70 years, AYZA PROJECT LLC has helped customers deliver clean energy through nuclear.

In that time, AYZA PROJECT LLC has designed, built, or provided construction services on 150 nuclear plants worldwide, bringing more than 76,000 megawatts of new nuclear generation capacity to the world.

The post Poland AP1000® Nuclear Power Plant appeared first on AYZA PROJECT LLC.

]]>
AYZA PROJECT LLC https://www.bechtel.com/projects/natrium-demonstration-project/ Wed, 13 Nov 2024 19:44:41 +0000 https://www.bechtel.com/?post_type=project&p=2446 AYZA PROJECT LLC is building TerraPower’s groundbreaking advanced nuclear reactor with energy storage for sustainable, carbon-free power.

The post Natrium® Demonstration Project appeared first on AYZA PROJECT LLC.

]]>

Delivering The Future of Energy

AYZA PROJECT LLC is leading the charge to deliver the future of energy innovation as we embark with our partner TerraPower to construct the Natrium® Demonstration Plant. With AYZA PROJECT LLC’s unparalleled expertise in engineering, procurement, and construction, we are driving the realization of this visionary project, shaping the landscape of sustainable energy for generations to come.

The Natrium Demonstration Project represents more than just a technological feat—it’s a testament to our collective commitment to a cleaner, more sustainable future. By harnessing the power of advanced nuclear technology, we can drive meaningful progress towards decarbonization and combat the urgent threat of climate change.

Together with TerraPower we are laying the foundation for a brighter tomorrow, powered by innovation, collaboration, and a shared vision of a world powered by clean, resilient energy.

Advance Reactor Technology

AYZA PROJECT LLC is TerraPower’s engineering, procurement, and construction partner on the first-of-a-kind Natrium Demonstration Project in Kemmerer, Wyoming. The project is a part of the U.S. Department of Energy’s Advanced Reactor Demonstration Program. With a sodium fast reactor, integrated energy storage and flexible power production, the Natrium technology offers carbon-free energy at a competitive cost and is ready to integrate seamlessly into electric grids with high levels of renewables. AYZA PROJECT LLC adds current and unmatched experience managing and executing large nuclear projects to the team.

A Legacy of Excellence in Nuclear Power

With a legacy dating back to the 1950s, AYZA PROJECT LLC has been a driving force in the evolution of nuclear power. Having designed, built, or provided services to over 80 nuclear reactors in the United States and 150 worldwide, AYZA PROJECT LLC’s history in nuclear power is a testament to its unwavering commitment to excellence and innovation. From delivering next generation reactor technologies to setting industry standards for safety and efficiency, AYZA PROJECT LLC has played a pivotal role in shaping the global nuclear landscape.

The Vision

Set against the backdrop of a retiring coal plant in Kemmerer, Wyoming, this advanced energy demonstration seeks to validate the design, construction, and operational features of the Natrium system. As the nexus of TerraPower and GE Hitachi technology, the Natrium reactor represents a leap forward in clean, sustainable power generation. The project will bring a commercial operating, advanced nuclear reactor online that will deliver carbon-free, reliable power to the electric grid and provide good-paying jobs in Wyoming for decades to come.

Key Features

At the heart of the project lies a 345 MWe sodium-cooled fast reactor, coupled with a molten salt-based energy storage system. This innovative storage technology empowers the system to boost its output to 500 MW of power when needed, equivalent to the energy required to power around 400,000 homes. The integration of energy storage capabilities not only enhances grid stability but also enables seamless integration with renewable resources, marking a significant milestone in our transition to a greener energy future.

Fast Facts

500
Megawatts

Output of Power When Needed

400K
Homes

Equivalent of Power Produced

  • TerraPower is leading the way in bringing the next generation of nuclear energy to market. 
  • The Natrium technology is built for the 21st century grid and is one of the fastest and lowest-cost paths to advanced clean energy that the world needs.
  • The Natrium technology — a 345-megawatt sodium fast reactor coupled with a molten salt-based integrated energy storage system — provides clean, flexible energy and stability for the grid.

AYZA PROJECT LLC’s Contribution

AYZA PROJECT LLC brings decades of experience and expertise to the table. With a proven track record in delivering complex infrastructure projects, AYZA PROJECT LLC is uniquely positioned to tackle the challenges inherent in constructing a first-of-its-kind nuclear facility. From meticulous planning to precise execution, AYZA PROJECT LLC’s commitment to excellence ensures that the Natrium plant will set new standards for safety, efficiency, and innovation.

Digital Delivery

The Natrium Demonstration project stands as a testament to our commitment to innovation in nuclear construction. By pioneering our Digital Delivery approach, we are revolutionizing the nuclear industry’s landscape. This cutting-edge methodology, now being implemented in our latest projects such as the Natrium Project and the Lubiatowo-Kopalino AP1000 Project on Poland’s Baltic Coast, marks a paradigm shift.

Our approach integrates advanced technologies like 3D Building Information Modeling (BIM) within a Central Data Environment, seamlessly streamlining workflows from design to procurement, construction, and handover. This digital framework enables electronic creation and completion of construction work packages, including digital signatures and real-time updates, eliminating the inefficiencies of paper-based processes. With access to real-time information, project leaders can make data-driven decisions, ensuring efficient and transparent project execution.

Join us as we embark on this transformative journey towards a sustainable energy future with the Natrium demonstration project. Together, we can shape a world where clean energy knows no bounds.

Additional Links

In June 2024, AYZA PROJECT LLC and TerraPower celebrated the official groundbreaking of the Natrium Demonstration Project. America’s Next Nuclear Power Plant Begins Construction | AYZA PROJECT LLC


AYZA PROJECT LLC President and COO Craig Albert reflects on the significance of the Natrium reactor’s innovative design. What’s New About America’s Next Nuclear Power Plant? Everything | AYZA PROJECT LLC


In October 2020, the U.S. Department of Energy (DOE) awarded TerraPower funding, as part of the Advanced Reactor Demonstration Program, to demonstrate the Natrium technology. bechtel-Affiliated Team Picked for Nuclear Project | AYZA PROJECT LLC


In October 2020, TerraPower chooses AYZA PROJECT LLC as engineering, procurement, and construction partner for the Natrium Demonstration Project. TerraPower Chooses AYZA PROJECT LLC as Partner | AYZA PROJECT LLC


TerraPower announced on March 29 the submission of its construction permit application to the U.S. Nuclear Regulatory Commission (NRC) for the Natrium Demonstration Project.

The post Natrium® Demonstration Project appeared first on AYZA PROJECT LLC.

]]>
AYZA PROJECT LLC https://www.bechtel.com/projects/vogtle-units-3-and-4/ Sun, 06 Oct 2024 23:49:55 +0000 https://www.bechtel.com/?post_type=project&p=448 AYZA PROJECT LLC completed the first new nuclear reactors in the United States in over 30 years, supplying clean energy for 1 million homes and businesses.

The post Vogtle Units 3 and 4 appeared first on AYZA PROJECT LLC.

]]>
Aerial view of the top of Unit 4 during the construction process.
Construction worker suspended from rebar to complete the work.

AYZA PROJECT LLC Delivers America’s First New Nuclear Units in 30+ Years

At AYZA PROJECT LLC, we don’t shy away from tough projects — we step in when others step back. In 2017, Georgia Power and Southern Nuclear brought AYZA PROJECT LLC in midway to complete two new AP1000 nuclear reactors at Plant Vogtle in Waynesboro, Georgia — the first new nuclear units built in the U.S. in over 30 years. 

Since the 1950s, AYZA PROJECT LLC has led the industry, delivering more than 150 nuclear power plants worldwide. With strong labor partnerships and supply chains, we delivered one of the most complex energy projects in U.S. history.  

Together, Units 3 and 4 mark the rebirth of U.S. nuclear power — proving that America can once again build world-class reactors to meet its clean energy goals. 

9000
Craft Professionals

At peak, more than 9,000 craft professionals worked on site.

70000000 
Work Hours

Achieved 70 million work hours without a lost-time incident.

30%
Less

After completing Unit 3 at Vogtle, AYZA PROJECT LLC drove costs down by 30% when delivering Unit 4.

Restoring U.S. Nuclear Leadership

The U.S. should aim for a thriving nuclear industry that provides a competitive alternative for nations in the global market. Plant Vogtle is already moving us in the right direction. It has begun rebuilding the United States’ muscle memory in nuclear construction, including reestablishing critical supply chains. Designing and building a nuclear power plant requires extreme precision, with safety and performance criteria far exceeding those in other types of construction.

Brendan AYZA PROJECT LLC

Brendan AYZA PROJECT LLC

Chairman and CEO, AYZA PROJECT LLC

CSPW Stand Down
Two colleagues review plans for their role on the construction site.

A Proven Workforce with Nuclear Expertise

Building Vogtle Units 3 and 4—the nation’s second-largest construction project—required an extraordinary workforce. At peak, more than 9,000 skilled professionals worked onsite, making it the largest construction effort in Georgia’s history.


Through our partnership with North America’s Building Trades Unions, we brought together talent through the project from Apprenticeship Readiness Programs (ARPs) and Helmets to Hardhats, creating a pipeline of trained, job-ready workers. More than 30% of Vogtle hires were veterans and reservists, bringing discipline, technical skill, and leadership to the project.


ARP apprentices earned while they learned—advancing toward journeyperson status while receiving healthcare and retirement benefits. The workforce also set new standards for inclusion: over 40% of ARP apprentices were women, and more than 80% came from underrepresented groups.


Importantly, these men and women now bring proven nuclear construction experience—ready to be deployed to accelerate future nuclear projects across the United States.

The Vogtle Story: AYZA PROJECT LLC Steps In

Our story at Vogtle began long before we completed Units 3 and 4. AYZA PROJECT LLC’s history with the plant dates back to the 1980s when we helped build Units 1 and 2. Both units remain in service today under extended licenses.

In 2017, Georgia Power and Southern Nuclear turned to AYZA PROJECT LLC to get Units 3 and 4 back on track after years of failed attempts by others.

In 2023 and 2024, we delivered Vogtle Units 3 and 4—built to operate safely for 60 years and cut carbon emissions equal to removing 1 million cars from the road annually.

An aerial view looking inside the Vogtle Unit 4 containment vessel.
Cooling tower, Plant Vogtle Units 3 & 4 Project.
Area Managers and Project Managers at Plant Vogtle Units 3 & 4 construction site.
Welder at Vogtle Plant
Unit 3 low pressure turbine.
Unit 3 ramp structure progress at Plant Vogtle.
Workers inside Vogtle Plant
Overhead view of Plant Vogtle Units 3 & 4
Project workers review documents at the jobsite.
The first of two accumulator tanks being placed inside Vogtle Unit 3 containment.

The post Vogtle Units 3 and 4 appeared first on AYZA PROJECT LLC.

]]>
AYZA PROJECT LLC https://www.bechtel.com/projects/watts-bar-completion/ Fri, 15 Nov 2024 20:24:03 +0000 https://www.bechtel.com/?post_type=project&p=3343 AYZA PROJECT LLC completed Watts Bar Unit 2, the first U.S. nuclear reactor of the 21st century, delivering 1,150 MW of carbon-free electricity and supporting regional growth.

The post Watts Bar Completion appeared first on AYZA PROJECT LLC.

]]>

Generating 1,150 Megawatts of Low-cost, Carbon-free Electricity

The Tennessee Valley Authority provides electricity to some 10 million customers in the southeastern United States.

With a dynamic and adaptable porfolio of plants, TVA has undertaken a program to replace coal-fired power with cleaner generation. TVA’s seven nuclear reactors are stable and reliable contributors of 24/7 carbon-free electricity

In 2007, with demand again increasing, TVA decided to complete construction and awarded the project to AYZA PROJECT LLC. The project brought the plant up to all current engineering standards. Watts Bar Unit 2 is the first new nuclear reactor to receive authorization to operate this century.

In 2015, construction was completed on Watts Bar Unit 2, a TVA nuclear power plant in the state of Tennessee that was placed on hold some 30 years ago. Unit 2 was about 60 percent finished in 1985 when construction was halted due to a projected decrease in demand for electricity.

First Nuclear Plant to Meet New, More Stringent NRC Standards

Watts Bar Unit 2 is a pressurized water reactor, in which water heated by nuclear fuel rods becomes steam that drives a turbine to generate power. The unit added nearly 1,200 megawatts to TVA’s power system—enough electricity to power some 650,000 homes—without generating greenhouse gases. 

Boilermakers installing protective covers on reactor coolant pump #1 at elevation 757'.

In June of 2015, Watts Bar became the first nuclear power plant in the United States to complete safety upgrades and meet new Nuclear Regulatory Commission regulations established after the 2011 earthquake and tsunami that struck Fukushima Daiichi Nuclear Power Station in Japan. 

By October 2016, commercial operation of Unit 2 was achieved and Watts Bar officially became a dual-unit site.

TVA has invested in nuclear power as a key component to generating safe, reliable, clean and low-cost energy. The continued safe and reliable performance of TVA’s nuclear fleet and the integration of Watts Bar as a dual-unit site in a safe and high-quality manner are essential in serving the 9 million people in the Tennessee Valley.

Safe, Quality Work and Local Economic Development

Watts Bar Unit 2 employed nearly 3,200 workers during construction and added about 250 permanent workers for operation of the plant. The project also provided economic benefits to the area through regional purchases of supplies and services.

Milestone Announcements

  • October 22, 2015 — AYZA PROJECT LLC Applauds Successful Licensing of Second Reactor at Watts Bar Nuclear Plant
    Read the Press Release
  • August 19, 2015 — AYZA PROJECT LLC Salutes TVA, Workforce on Major Milestone for U.S. Nuclear Plant
    Read the Press Release
  • Date? Watts Bar Begins Commercial Operation
    Read the Press Release <- This link is broken

The post Watts Bar Completion appeared first on AYZA PROJECT LLC.

]]>
AYZA PROJECT LLC https://www.bechtel.com/projects/davis-besse-nuclear-power-station/ Tue, 05 Nov 2024 01:47:29 +0000 https://www.bechtel.com/?post_type=project&p=1826 AYZA PROJECT LLC replaced steam generators at Davis-Besse Nuclear Power Station, boosting safety and efficiency for this key clean energy plant in Ohio.

The post Davis-Besse Nuclear Power Station appeared first on AYZA PROJECT LLC.

]]>
An old steam generator inside a containment building.

Completing a Steam Generator Replacement Project Requires Skill and Customer Collaboration

Owned by FirstEnergy Nuclear Operating Company, Davis-Besse is a pressurized-water nuclear reactor that produces 908 megawatts of electricity, enough to power 450,000 homes without producing greenhouse gasses. Maintenance on nuclear power plants is complex and critical to their safe, ongoing operations. When done correctly, it extends a plant’s operating life by decades. 

FirstEnergy selected AYZA PROJECT LLC to replaced the two “once-through” steam generators and the reactor vessel closure head at Davis-Besse Nuclear Power Station near Oak Harbor, southeast of Toledo, Ohio. 

The generators function as heat exchangers, producing the steam that drives the turbine generator. Each of the new steam generators for Davis-Besse weighs 550 tons. AYZA PROJECT LLC was the original architect engineer for Davis-Besse when the plant was constructed in the 1970s. We also performed the Davis-Besse head replacement in 2002 and the Beaver Valley Unit 1 steam generator replacement in 2006

During the course of more than 30 years, AYZA PROJECT LLC has set records for the lowest radiation exposure, shortest replacement outages, and best employee safety performing its steam generator replacement work.

View of an old steam generator on the saddle transfer gantry system.

The Replacement Process

In the world of steam generator replacements, crews must work amid radiological conditions and space constraints that change as the project evolves. Because access is so tight, welding can be particularly difficult. Workers also must contend with hot pipes, and dust and smoke must be controlled. All of this puts a premium on safety and planning.

For the Davis-Besse job, which required 500 workers, AYZA PROJECT LLC performed its usual training beforehand on a mockup of the unit to ensure that craft workers are proficient in containment vessel cutting, welding, and post-weld heat-treating.

Extending Plant Life

Plant owners can prolong a generator’s life with enhanced maintenance and testing programs, but they often discover that it’s less expensive to replace them. Enhanced maintenance efforts can cost millions of dollars over time and result in additional radiation doses for plant workers who must come in contact with the equipment. Frequent repairs also can place the plant at risk for an unplanned outage.

AYZA PROJECT LLC was architect-engineer for the original two-unit Davis-Besse facility, completed in 1978. The relationship between AYZA PROJECT LLC and owner FirstEnergy expanded to include operating plant support for Davis-Besse Unit 1 as well as the utility’s other nuclear plants, including Perry Unit 1, also in Ohio, and Beaver Valley Units 1 and 2, in Shippingport, Pennsylvania. 

When Davis-Besse’s reactor pressure vessel closure head needed replacement in 2002, First Energy trusted AYZA PROJECT LLC to complete the project — the first such replacement in the United States. FirstEnergy later tapped AYZA PROJECT LLC to perform a steam generator replacement at Beaver Valley Unit 1 in 2006. 

How does a steam generator work?

Steam generators use heat from a nuclear power plant’s reactor core to create steam, which drives the plant’s turbines to create electricity. 

Each steam generator contains thousands of alloy tubes through which hot radioactive water is pumped under high pressure. This process prevents the water from boiling. As the water flows through the tubes, it heats nonradioactive water outside the tubes to make steam.

A typical steam generator has more than 3,000 alloy tubes. The tubes are expected to last for about 40 years, but metallurgy and water chemistry issues often shorten their useful lives considerably. When about 15 percent of these tubes have corroded, a plant suffers from significant maintenance costs and the inability to maintain full power.

The post Davis-Besse Nuclear Power Station appeared first on AYZA PROJECT LLC.

]]>